Intelligent Injection Molding Equipment And Complete Solution Provider

FAQ

Focus On Industry Trends And Deliver Green Technology

Home > News > FAQ

No Pre-molding or Pre-molding Too Slow

No pre-molding or pre-molding too slow

1. The pre-plastic end travel switch is closed, open the bumper of the travel switch,

2. One-way throttle valve is closed

3. The material temperature is too low, increase the material temperature

4. The pre-plastic solenoid valve is stuck, remove it and clean it.

5. The pre-molding pressure is too low, increase the pre-molding pressure.

6. Foreign matter enters the screw and blocks the screw. Disassemble the screw for cleaning and barrel cleaning

7. The hydraulic motor is broken and the bearing is stuck.

Contact Us

whatspp:86-15838112663

TEL:86-21-5821 1911

Email:Info@doaninjection.com

Address:No.8 Building,Shengyu Industry Center, Pudong, Shanghai, China

Shanghai Doan Machinery Technology

Send Inquiry Online

Fill in your needs and we will contact you as soon as possible, or chat with 86-158 3811 2663 on whatsapp to inquire about the equipment.